AAFB 3MG Water Tank Concrete Root Replacement
Project Title:

AAFB 3MG Water Tank Concrete Root Replacement
Project Type: Project Management, Structural Design

Project Status: Completed

Budget:

Client Type:

Description:

Location: Anderson Airforce Base Yigo, Guam

Project Management for the Design and Construction Quality Control for replacement of reinforced concrete roof for the 3MG circular concrete tank reservoir. The reservoir tank roof collapsed and William was in charge of the Assessment, analysis of cause of collapse and served as expert witness when the cost for replacement were litigated.

The entire project included 11 exploratory deep wells, the construction of (5) deep water wells, the construction of five (5) deep water wells, 47,840+ LF of 6″, 8″, 12″, 14″ and 16″ Ø PVC water transmission piping, 3MG post-tensioned concrete water reservoir, treatment plant, booster pump station and 2,440 LF of distribution line for the base potable water system.