Location: Tumon, Guam Principle-In-Charge for Overall Project Management of a $20+M rehabilitation of Guam’s Tourist District in the heart of historic Tomhum, Guam. The project involved the rehabilitation of four (4) lanes of paved highway with drainage, architecturally focused pedestrian access, traffic control, landscaping and drainage improvements. Oversaw project management team which managed both the … Tumon Bay Beautification Phases I and II
Location: AAFBG, Yigo, Guam Assembled the Project Quality Control Plan and obtained NavFac and PacDiv approval for the Plan. Later as the project began to experience significant delays because of environmental and techncal issues, was hired as Project Manager to bring the project to completion. The $14M project consisted of 11 exploratory deep wells, the … Replace Off-Base Water Supply, Anderson Air Force Base Guam (2008)
Location: Piti, Guam Principal-In-Charge of Design Team and Construction Management Team for the design of a state-of-the-art fiber duct, security access and communications backbone for this key U.S. Port. This project was ARRA- funded.
Project Design Managment of a $200M+ high-rise (15- and 19-story) luxury condominium housing complex. Managing the design effort which included designers in Guam and abroad, using a variety of planning and design software. Conducting design reviews, code compliance reviews, quality checks and reviews of computations, calculations, preliminary and final designs. The work includes architectural, landscaping, … Summer Towers
Location: Agat/Santa Rita, Guam Project Management, including on-site quality control and professional engineering consulting services for Phase I of this Government of Guam project, which involved environmental and grading work in preparation for construction of the wastewater treatment plant under Phase II.
Location: Anderson Airforce Base Yigo, Guam Project Management for the Design and Construction Quality Control for replacement of reinforced concrete roof for the 3MG circular concrete tank reservoir. The reservoir tank roof collapsed and William was in charge of the Assessment, analysis of cause of collapse and served as expert witness when the cost for … AAFB 3MG Water Tank Concrete Root Replacement